A Michelessi bespoke kitchen comes about in six steps: survey of the measurements, 3D design, choice of materials in person, numerically controlled cutting with hand finishing, installation by our own team, final check.
1. The survey
We measure the width, depth and height of every wall, windows, doors, columns, radiators and the water, waste, gas and electrical connections, and we note the corners that are not at 90°: out-of-square walls are what a modular kitchen solves with filler pieces and cuts and a bespoke kitchen follows. In Lazio the site survey is free; from the rest of Italy and from abroad we guide you through the survey remotely, measurement by measurement.
2. The 3D design
The technical office draws the kitchen in three dimensions: layout, heights, housings for the appliances, worktop, doors and island, and corrects it with you until it is the right one. If you already own an oven, a fridge or a dishwasher, the built-in dimensions are all that is needed; for those renovating, the design fixes where connections and waste pipes are to be moved before the contractor cuts the chases.
3. The materials, chosen in person
In the Aprilia workshop the slabs of marble, granite, quartzite and sintered stone are chosen one by one: the vein that will end up on the island is your decision, in front of the slab. Wood, steel and stoneware are compared on samples.
4. Cutting in the workshop
Worktops, end panels, upstands and integrated sinks are cut on numerically controlled machines and finished by hand: edges, 45° mitred joints of waterfall ends, cut-outs for hob, sink and tap. Doors in solid wood or steel are built to the same dimensions.
5. Installation
Our own team installs the kitchen throughout Italy; the water, gas and electrical installations are carried out by a licensed contractor, as Italian law (DM 37/2008) requires, who issues the declaration of conformity. Abroad we have one real project, in Dubai; elsewhere we work on request, with a remote survey.
6. The final check
We check doors, drawers, hob, sink and extractor. Timing depends on the design, its complexity, the state of the site and the logistics: we write it in the quote.