The slab is worked in the workshop before it reaches the site
The stone step seen from Aprilia: the slab chosen in the design is cut by numerically controlled machines to the survey measurements and finished before fitting. It is why the stone is decided at the design stage and laid only once screeds and services are finished: the workshop works to certain measurements, the site receives numbered pieces.